Research on Formwork Construction Technology of Railway Bridge

Hua, Qiao De (2023) Research on Formwork Construction Technology of Railway Bridge. Journal of Engineering Research and Reports, 24 (12). pp. 120-128. ISSN 2582-2926

[thumbnail of Hua24122023JERR99142.pdf] Text
Hua24122023JERR99142.pdf - Published Version

Download (379kB)

Abstract

With the continuous development of railway bridge construction, the application of new technology, new technology and new materials is becoming more and more extensive, which puts forward higher requirements for the design and construction of formwork. This article takes railway bridge templates as the research object, and focuses on the technical difficulties in the design and construction of prefabricated and assembled bridge templates for segments. Combined with the currently under construction Zhengzhou to Xuchang railway elevated bridge project, the short line method is used for construction, and the types of railway bridge templates, design and construction techniques of templates are introduced. Combining engineering examples to illustrate the characteristics of template design and construction, this provides a reference for the design and construction of similar bridge templates in the future.

Item Type: Article
Subjects: OA Open Library > Engineering
Depositing User: Unnamed user with email support@oaopenlibrary.com
Date Deposited: 25 Apr 2023 11:12
Last Modified: 02 Feb 2024 04:00
URI: http://archive.sdpublishers.com/id/eprint/598

Actions (login required)

View Item
View Item